The new power supply unit (PSU) for the coming PtX facility was delivered yesterday to GreenLab. The preparations for the first test site are progressing.
The PSU converts 10 kV AC (Alternating voltage) from the national grid into a low DC (Direct voltage). It is a key component in the 6MW test site facility, as it will supply the electrolyser module with energy. And soon, it will be green energy coming directly from the wind turbines and solar panels in and around GreenLab.
The prototype of the electrolyser module from Green Hydrogen Systems will be delivered shortly.
Watch the video below to see the delivery and preparations of the site.